🎉 The #CandyDrop Futures Challenge is live — join now to share a 6 BTC prize pool!
📢 Post your futures trading experience on Gate Square with the event hashtag — $25 × 20 rewards are waiting!
🎁 $500 in futures trial vouchers up for grabs — 20 standout posts will win!
📅 Event Period: August 1, 2025, 15:00 – August 15, 2025, 19:00 (UTC+8)
👉 Event Link: https://www.gate.com/candy-drop/detail/BTC-98
Dare to trade. Dare to win.
The 209th execution layer core developer meeting of Ethereum discussed the details of the Pectra and Fusaka upgrades.
According to the Gate.io News bot, Tim Beiko summarized the 209th Ethereum execution layer core developer meeting (ACDE), which focused on two main topics:
The Pectra upgrade plan will release the client on April 21 and add the delegation status of EIP-7702 to the JSON-RPC of the latest block.
The Fusaka upgrade has confirmed the inclusion of three EIP proposals: EIP-7823 sets a clear limit for the MODEXP opcode; EIP-7825 sets a gas limit for single transactions; EIP-7907 introduces a measurement mechanism for contract code size. In addition, either EIP-7762 or EIP-7918 will be included, which respectively involve adjusting the minimum base fee for blobs and linking the base fee of blobs to execution costs.
Source: Wu Shuo